Estimation And Costing In Civil Engineering objective questions and answers


6.  The estimated time required to complete an activity is known as


   A. Duration

   B. Restraint

   C. Constraint

   D. Float


✔ View Answer


D. Float

✍ Your Comments

Your name:

Your Email:

Your Comments:



7.  Estimate for electric wiring that is light, fan, plug points etc. is usually made in terms of


   A. Total power at mains in KW

   B. Amperage of every point

   C. Type of points

   D. Number of points


✔ View Answer


A. Total power at mains in KW

✍ Your Comments

Your name:

Your Email:

Your Comments:



8.  The most reliable estimate is


   A. Detailed estimate

   B. Preliminary estimate

   C. Plinth area estimate

   D. Cube rate estimate


✔ View Answer


C. Plinth area estimate

✍ Your Comments

Your name:

Your Email:

Your Comments:



9.  Pick up the item of work not included in the plinth area estimate


   A. Wall thickness

   B. Verandah area

   C. W.C. area

   D. Courtyard area


✔ View Answer


B. Verandah area

✍ Your Comments

Your name:

Your Email:

Your Comments:



10.  The main factor to be considered while preparing a detailed estimate is


   A. Quantity of the materials

   B. Vanilability of materials

   C. Transportation

   D. All of the above


✔ View Answer


C. Transportation