Irrigation Engineering - Irrigation Engineering objective questions and answers


21.  The most suitable location of a canal head work, is


   A. Boulders stage of the river

   B. Delta stage of the river

   C. Rock stage of the river

   D. Through stage of the river


✔ View Answer


D. Through stage of the river

✍ Your Comments

Your name:

Your Email:

Your Comments:



22.  The uplift pressure on the roof of an inverted syphon, is maximum when


   A. Drain is running dry

   B. Canal is running

   C. Canal is running with F.S.L.

   D. Drain is running with H.S.L.


✔ View Answer


D. Drain is running with H.S.L.

✍ Your Comments

Your name:

Your Email:

Your Comments:



23.  A silt regulator located at the head of a channel, is called


   A. Head extractor

   B. First regulator

   C. Silt-excluder

   D. Silt injector


✔ View Answer


C. Silt-excluder

✍ Your Comments

Your name:

Your Email:

Your Comments:



24.  The ratio of the head recovered to the head put in, is called


   A. Head regained

   B. Efficiency

   C. Sensitivity

   D. Flexibility


✔ View Answer


B. Efficiency

✍ Your Comments

Your name:

Your Email:

Your Comments:



25.  The soil moisture useful in the plant growth is


   A. Hygroscopic water

   B. Chemical water

   C. Capillary water

   D. Gravity water


✔ View Answer


C. Capillary water

✍ Your Comments

Your name:

Your Email:

Your Comments:






< 1 2 3 4 5 6 7 8 9 Next>






Enter Your Suggestion/Comments Here










Can't read the image? Click here to refresh