Railway Engineering - Railway Engineering objective questions and answers


6.  'Crossing clearance' is the distance between Crossing Rail and


   A. Check rail

   B. Wing rail

   C. Tongue rail

   D. Point


✔ View Answer


B. Wing rail

✍ Your Comments

Your name:

Your Email:

Your Comments:



7.  The gap moved by two tongue rail is known as


   A. Toe of switch

   B. Lead

   C. Throw of switch

   D. Heel of switch


✔ View Answer


C. Throw of switch

✍ Your Comments

Your name:

Your Email:

Your Comments:



8.  The type of rail crossing least preferred is


   A. Diamond crossing

   B. Square crossing

   C. Acute crossing

   D. Double crossing


✔ View Answer


B. Square crossing

✍ Your Comments

Your name:

Your Email:

Your Comments:



9.  Which of the following is a part of a switch in a railway track?


   A. Lead rail

   B. Splice rail

   C. Heel block

   D. Wing rail


✔ View Answer


C. Heel block

✍ Your Comments

Your name:

Your Email:

Your Comments:



10.  Rail section is generally designated by its


   A. Total weight

   B. Total length

   C. Weight per meter length

   D. Area of its cross-section


✔ View Answer


C. Weight per meter length

✍ Your Comments

Your name:

Your Email:

Your Comments:






< 1 2 3 4 5 6 7 8 9 10 Next>






Enter Your Suggestion/Comments Here










Can't read the image? Click here to refresh