Railway Engineering objective questions and answers Pdf


21.  In rainy season the dust in the ballast becomes mud and comes up by suction from below the rain joint. Such joint is called


   A. Blowing joint

   B. Mud joint

   C. Water joint

   D. Pumping joint


✔ View Answer


D. Pumping joint

✍ Your Comments

Your name:

Your Email:

Your Comments:



22.  In which condition of rail surface, the coefficient of friction will be the least?


   A. Very wet

   B. Very dry

   C. Greasy

   D. Average dampness


✔ View Answer


C. Greasy

✍ Your Comments

Your name:

Your Email:

Your Comments:



23.  The rails of a track are placed


   A. At an inward slope of 1 in 10

   B. At an inward slope of 1 in 15

   C. At an inward slope of 1 in 20

   D. At an inward slope of 1 in 25


✔ View Answer


C. At an inward slope of 1 in 20

✍ Your Comments

Your name:

Your Email:

Your Comments:



24.  The movable end of the tapered rail, by means of which the flange wheels of the train are diverted from one track to another, is known as


   A. Stud

   B. Heel

   C. Toe

   D. Flare


✔ View Answer


C. Toe

✍ Your Comments

Your name:

Your Email:

Your Comments:



25.  The smart phone signals located in such positions from where trains start for their next destination, are known as


   A. Warner signals

   B. Starter signals

   C. Repeater signals

   D. Router signals


✔ View Answer


B. Starter signals

✍ Your Comments

Your name:

Your Email:

Your Comments:






< 1 2 3 4 5 6 7 8 9 10 Next>






Enter Your Suggestion/Comments Here










Can't read the image? Click here to refresh