Water Supply Engineering - Water Supply Engineering objective questions and answers


21.  Reverse osmonics process is used for


   A. Desalinization

   B. Fluoridation

   C. Distillation

   D. Freezing


✔ View Answer


A. Desalinization

✍ Your Comments

Your name:

Your Email:

Your Comments:



22.  The starch iodide test is performed to test


   A. Residual bromine

   B. Residual iodine

   C. Residual chlorine

   D. Residual CO2


✔ View Answer


C. Residual chlorine

✍ Your Comments

Your name:

Your Email:

Your Comments:



23.  Field of a well is


   A. The maximum amount of water available

   B. Water available continuously for one hour

   C. Water that can be drawn in 24 hours

   D. The maximum quantity of water that can be continuously drawn with fixed depression


✔ View Answer


D. The maximum quantity of water that can be continuously drawn with fixed depression

✍ Your Comments

Your name:

Your Email:

Your Comments:



24.  Potassium permanganate is used for


   A. Reducing hardness

   B. Reducing acidity

   C. Improving colour

   D. De-chlorination


✔ View Answer


D. De-chlorination

✍ Your Comments

Your name:

Your Email:

Your Comments:



25.  Air binding in rapid sand filters is caused due to


   A. High Pressure

   B. Atmospheric pressure

   C. Negative pressure

   D. Excessive turbidity


✔ View Answer


C. Negative pressure

✍ Your Comments

Your name:

Your Email:

Your Comments:




< 1 2 3 4 5






Enter Your Suggestion/Comments Here










Can't read the image? Click here to refresh