Estimation And Costing Mcq pdf download


46.  Which one is the waterproof cement point?


   A. Snowcem

   B. Supercem

   C. Aquacem

   D. All of the above


✔ View Answer


B. Supercem

✍ Your Comments

Your name:

Your Email:

Your Comments:



47.  Detailed drawing is not necessarily required for which of the following estimate?


   A. Detailed estimate

   B. Revised estimate

   C. Supplementary estimate

   D. Rough cost estimate


✔ View Answer


A. Detailed estimate

✍ Your Comments

Your name:

Your Email:

Your Comments:



48.  A dummy activity


   A. Does not require any resource nor any time

   B. Requires source as well as time

   C. Requires source but not any time

   D. Does not require any source but requires time


✔ View Answer


C. Requires source but not any time

✍ Your Comments

Your name:

Your Email:

Your Comments:



49.  Which soil will have the maximum permissible load per square metre?


   A. Black cotton soil

   B. Moist clay

   C. Loose sand

   D. Compact gravel


✔ View Answer


A. Black cotton soil

✍ Your Comments

Your name:

Your Email:

Your Comments:



50.  The quantum of work of any item is skilled labour is expected to do in a day, is known as


   A. Standard work

   B. Work to specification

   C. Target work

   D. Test work


✔ View Answer


B. Work to specification