Railway Engineering - Railway Engineering objective questions and answers


11.  The check rails are placed opposite the crossing so that


   A. It is symmetrically placed opposite nose of crossing

   B. Its one third length is ahead of the nose of crossing

   C. Its two third length is ahead of the nose crossing

   D. Its three fourth length is ahead of the nose of crossing


✔ View Answer


C. Its two third length is ahead of the nose crossing

✍ Your Comments

Your name:

Your Email:

Your Comments:



12.  A triangle of railway consists of


   A. Three turnouts

   B. One turnout and two diamonds

   C. Two turnouts and one split

   D. One turnout, one split and one diamond


✔ View Answer


C. Two turnouts and one split

✍ Your Comments

Your name:

Your Email:

Your Comments:



13.  Rail tops of a track are placed


   A. At an inward slope of 1 in 20

   B. At an outward slope of 1 in 20

   C. At an inward slope of 1 in 30

   D. At an outward slope of 1 in 30


✔ View Answer


A. At an inward slope of 1 in 20

✍ Your Comments

Your name:

Your Email:

Your Comments:



14.  Arrangement made to divert the trains from one track to another is known as


   A. Railway point

   B. Railway crossing

   C. Turnout

   D. Railway Junction


✔ View Answer


C. Turnout

✍ Your Comments

Your name:

Your Email:

Your Comments:



15.  The force which resists the forward movement and speed of train is called


   A. Friction

   B. Tractive resistance

   C. Hauling resistance

   D. Track modulus


✔ View Answer


B. Tractive resistance

✍ Your Comments

Your name:

Your Email:

Your Comments:






< 1 2 3 4 5 6 7 8 9 10 Next>






Enter Your Suggestion/Comments Here










Can't read the image? Click here to refresh